Day three – T-Day

Today was the heavy load day. installing the toptent

Thanks to all the neighbours who helped lifting the tent and put it in place.

Part to that, the left wing protector got installed, some minor items added and wired the winch power cable to the the main battery.

Final connection will be done later after finding a proper box for the Albright switch.

Last work today was fixing the tent to the body. Left is refitting the top door L bar to support the door rubbers, trying to refit part of the roof interior and refitting the wiring.

Link to album
Some random photo's: